2R Erosion & Sediment Control (214) 669-0426 Request a Bid

Services

What we handle on your site.

Five services, one sub — from the first plan set to the Notice of Termination.

01

SWPPP Preparation

A site-specific stormwater pollution prevention plan built from your civil drawings — and kept current as the site changes.

  • Site-specific SWPPP written to the applicable construction general permit
  • SWPPP site maps showing drainage, BMP locations, and disturbed areas
  • BMP selection with installation details
  • Plan amendments as phasing, grading, or site conditions change
02

Permit Filing — NOI, NOT & Site Notices

The permit paperwork handled start to finish, so coverage is in place before you break ground and closed out when you're done.

  • Notice of Intent filed through TCEQ STEERS
  • Oklahoma DEQ filings for Oklahoma projects
  • Required site notices and postings
  • Notice of Termination at final stabilization
03

Stormwater Inspections

Inspections on the schedule your permit requires, with reports written to stand up when a regulator walks the site.

  • Routine inspections on the permit schedule
  • Rain-event inspections
  • Photo-documented, signed reports delivered same day
  • Corrective action tracking through completion
04

BMP Installation & Maintenance

The controls in the ground — installed to detail and kept working through every rain event.

  • Silt fence and inlet protection
  • Rock construction entrances
  • Wattles / sediment logs and rock check dams
  • Concrete washouts
  • Ongoing maintenance and repair
05

Corrective Actions & Final Stabilization

Fixes when a rain event or an inspector finds something, and a clean closeout when the project is done.

  • Repairs after rain events or inspector findings
  • Final stabilization documentation
  • Permit closeout

Have a project going to bid? Send us the plans.

Request a Bid