2R Erosion & Sediment Control Send Your Plans
For General Contractors

Everything stormwater, one sub.

Five services from the first plan set to the Notice of Termination.

01

SWPPP Preparation

A site-specific stormwater pollution prevention plan built from your civil drawings and kept current as the site changes.

  • Written to the applicable construction general permit
  • Site maps showing drainage, controls and disturbed areas
  • Control selection with installation details
  • Amendments as phasing, grading or site conditions change
02

NOI, NOT and Site Notices

The permit paperwork handled start to finish, so coverage is in place before you break ground and closed out when you are done.

  • Notice of Intent filed through TCEQ STEERS
  • Oklahoma DEQ filings for Oklahoma projects
  • Required site notices and postings
  • Notice of Termination at final stabilization
03

BMP Installation and Maintenance

The controls in the ground, installed to detail and kept working through every rain event.

  • Silt fence and inlet protection
  • Rock construction entrances
  • Wattles, sediment logs and rock check dams
  • Concrete washouts
  • Ongoing maintenance and repair
04

Stormwater Inspections

Inspections on the schedule your permit requires, with reports written to stand up when a regulator walks the site.

  • Routine inspections on the permit schedule
  • Rain-event inspections
  • Photo-documented, signed reports delivered same day
  • Corrective actions tracked through completion
05

Corrective Actions and Final Stabilization

Fixes when a rain event or an inspector finds something, and a clean closeout when the project is done.

  • Repairs after rain events or inspector findings
  • Final stabilization documentation
  • Permit closeout
For owners

Need sealed erosion control sheets?

PE-sealed erosion control plans for the permit set.

Erosion Control Plans

Have a project going to bid?

Send the plans and we reply within one business day.

CallSend Plans